Comnet CNGE2FE8MSPOE Technical Information Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 162
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
13
Chapter 3 Hardware Installation
In this paragraph, we will describe how to install the 8 10/100TX w/ X-Ring Managed
Industrial Switch and the installation points attended to it.
3.1 Installation Steps
1. Unpack the Industrial switch
2. Check if the DIN-Rail is screwed on the Industrial switch or not. If the DIN-Rail is not
screwed on the Industrial switch, please refer to DIN-Rail Mounting section for DIN-Rail
installation. If users want to wall mount the Industrial switch, please refer to Wall Mount
Plate Mounting section for wall mount plate installation.
3. To hang the Industrial switch on the DIN-Rail track or wall.
4. Power on the Industrial switch. Please refer to the Wiring the Power Inputs section for
knowing the information about how to wire the power. The power LED on the Industrial
switch will light up. Please refer to the LED Indicators section for indication of LED
lights.
5. Prepare the twisted-pair, straight through Category 5 cable for Ethernet connection.
6. Insert one side of RJ45 cable (category 5) into the Industrial switch Ethernet port (RJ45
port) and another side of RJ45 cable (category 5) to the network device’s Ethernet port
(RJ45 port), ex: Switch PC or Server. The UTP port (RJ45) LED on the Industrial switch
will light up when the cable is connected with the network device. Please refer to the
LED Indicators section for LED light indication.
[NOTE]
Make sure that the connected network devices support MDI/MDI-X. If it does not
support, use the crossover category-5 cable.
7. When all connections are set and LED lights all show in normal, the installation is
complete.
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 161 162

Comments to this Manuals

No comments